OTHERS OUTLET

FUMES

Full Plant (m³/h) Intergrade plant (m³/h) Temperature (°C)
Thermal Unit 7400 3700 220
Venturi Scrubber 50000 25000
Thermoshrinkable Unit 520 260 150

MIST

MIST coming from compound units, bitumen tanks and production lines.

Full plant (g/h) Intergrade plant (m³/h)
Venturi Scrubber (peak running) 3500 g/h 1750

WASTE WATER

Full plant (m³) Intergrade plant (m³) Temperature (°C)
Venturi Scrubber 30 per year 15 per year
Cooling Water (no recycling) 80 per h 40 per h at 45°C
Cooling Water (with recycling) 3,6 per h 1,8 per h at 45°C

SECOND CHOICE MEMBRANE

SECOND CHOICE MEMBRANE about 0,75% m² of production

SWEEPINGS

Full plant Intergrade plant
Waste membrane about 1.2% m² of production
Reinforcement Snippets about 0,02% m² of production
Paper bags, plastics and empty big bags about 6 T per year about 3 T per year